| Maxi 3 Hour 2006 - Team Performance |
![]() |
Team : 623 - Liz Hatley
Ctl Control Description Distance Leg Time Position 42 High point, 0.8m, NE side . 00:07:21 11 out of 12 32 Ruin, E-corner, inside 632.5 00:09:47 13 out of 15 51 Minor watercourse 924.3 00:17:22 23 out of 24 65 Small depression 905.4 00:15:13 19 out of 19 41 Clearing, N-part 734.5 00:17:21 18 out of 20 33 Broken ground, W-tip 614.8 00:10:13 22 out of 25 43 Minor watercourse junction 431.7 00:07:15 21 out of 28 52 Minor watercourse, E-end 707.8 00:12:01 24 out of 31 44 Earth wall, E-side 513.8 00:08:40 31 out of 43 34 Dam (pond), NW Side 554.5 00:09:08 31 out of 38 45 Pit, S-side 489.5 00:08:41 13 out of 19 31 High Point 1m, E-side 1001.7 00:16:45 3 out of 5 S Unknown Control . 00:08:13 14 out of 18